Monday, April 4, 2011

Bathroom Remodel

Major Project Complete! Juan did an awesome job! It was a lot of work but so worth it in the end.
BEFORE....
As you can see from this above picture, the tile was a black and white, and only a portion of it was grouted, and 2 tiles towards the door more were broken. The ground isn't super even in here, so that is why those two tiles broke. There was no wall and was exposing pipes. There was only plywood above the showe and there was tongue and groove walls.
Another view from the side of the bathroom


AND AFTER.....
New tile, we have a door! Before there was a door, we had a big piece of plywood that we would slide over the door. Only problem, we had a little peeping tom named Keenan because there were some holes cut out in it. We had no Mirror for a long time and the light switch didn't work that you see here. (above) Also the lights were not there. Our friend upstairs found this light at the local DI and Juan made it work and connected it so that this light switch would work. Before the light worked, we had to open the door, and shut it and use the switch behind the door. (below)
There is now cown and trim
And NEW TILE! We waited a long time to grout the area where the uneven floor is. Because of the coldness, we had to keep the door shut with the heater on so that things would dry.


Didn't he do an amazing job?

4 comments:

David and Kira said...

wow! big project. Doesn't even look like the same bathroom!! Good job!!!

smcgary said...

I can't wait to try out the new bathroom. That's why we're coming to Rexburg, oh, yeah, and the fact Juan is graduating is just a little bonus. :) See you soon!

k and p said...

Congratulations! Isn't it so awesome to have such a handy husband?! :)

Mrs. Mandy said...

he did do a great job! THANK YOU!